WMU Board of Trustees Plaza Renovation

SERVICES PROVIDED

  • Master Planning

  • Schematic Design

  • Construction Documents

  • Bidding Assistance

  • Contract Administration

  • Project Management


SUB CONSULTANTS

Slocum Architects

Geotech, Inc.

Engineering Plus, Inc.

LDW 2.0

TMB Consulting


ESTIMATED PROJECT BUDGET

$1.8 million


YEAR COMPLETED

2022

Awards

Merit Award: American Society of Landscape Architects/Michigan Chapter 2023

OCBA was retained to redesign a fountain space between the Library and the new Student Center in the heart of the WMU campus. Goals included creating a low maintenance green space with the sound of water, and reusing most if not all of the granite slabs WMU had acquired from a previous buiding demolition.

Existing retaining walls were refaced and recapped with granite, and curved seat wall were placed in front of a series of granite steps over with water flows into a pondless basin before it is recirculated to the top. The angular granite fountain steps are softened by lush sedge and ornamental grass plantings.

Chelsie Wyse

I’m Chelsie Wyse, Founder of TACT Marketing Strategy, where we turn marketing chaos into business growth and messaging clarity.

With over 15 years in the advertising industry, I specialize in growth marketing—building strategies, campaigns, and brands that drive visibility, engagement, and revenue.

My expertise spans brand development, CRM improvement strategy, systems development, creative partnership management, and content creation and deployment; all grounded in a deep understanding of client experience and small business ownership.

I believe marketing should be intentional, measurable, and aligned with genuine business objectives. Every project I lead is designed to create lasting impact and support sustained business growth.

https://get-intact.com
Previous
Previous

Pleasant Avenue Reconstruction

Next
Next

Library Corridor Connection